举报文档 收藏
/75
帮帮创意 > 国防军事 > 美国国防部游艇码头设计规范.pdf

美国国防部游艇码头设计规范.pdf

美国国防部游艇码头设计规范.pdf
内容要点:
美国国防部游艇码头设计规范,UFC 4-152-07 14 JULY 2009 A - 3 Executive Panel UFC 3-530-01, Design: Interior and Exterior Lighting and Controls, August 2006, Tri-Service Engineering Senior Executive Panel UFC 4-152-07 14 JULY 2009 A - 2 Guidelines for Design of Marinas, Australian Standard, 2001, Standards Australia International Ltd. Layout and Design Guidelines for Marina Berthing Facilities, CaliforUFC 4-152-07 14 JULY 2009 A - 1 APPENDIX A REFERENCES Boats and Small Craft, Naval Ships Technical Manual Chapter 583, 24 Mar 1998 Coastal Engineering Manual (CEM)– II-5-3, Water Levels and Long WavesUFC 4-152-07 14 JULY 2009 11 - 4 11-1.4.5 Lighting. High level lighting for the launching and retrieval area may be required to support night time operations. Avoid glare that can interfere with naviUFC 4-152-07 14 JULY 2009 11 - 3 11-1.4 Shoreside Support Facilities. 11-1.4.1 Trailer Maneuvering. Provide sufficient area at the head of the ramp for trailer maneuvering; typically an area 50 ft xUFC 4-152-07 14 JULY 2009 11 - 2 11-1.2.5 Ramp Width. Standard launching ramp lane width is 15 ft (4.5 m) when 2 or more lanes are provided. When a single lane is provided, the width should be 20 ft.UFC 4-152-07 14 JULY 2009 11 - 1 CHAPTER 11 LAUNCHING RAMPS 11-1 GENERAL REQUIREMENTS – WATER AREA 11-1.1 Fairway. The Basin or other waterway into which a launching ramp extends should meet the fUFC 4-152-07 14 JULY 2009 10 - 3 10-3.5 Floating Lift. Floating boat lifts use buoyancy chambers to raise small craft out of the water much like a floating dry dock. The typical floating lift is peUFC 4-152-07 14 JULY 200

发表评论

暂无评论,赶快抢占沙发吧。

ap****8

在线客服